How to Install an Automatic Standby Generator

View the full episode:

This Old House host Kevin O’Connor explains how you can combat power interruptions with a standby generator. (See actions below.).

Click on this link to REGISTER FOR the main This Old Home YouTube channel:.

Actions for How to Install an Automatic Standby Generator.
1. Mount the generator at the very least 5 feet from all doors and windows.
2. Set the generator in addition to a pre-cast concrete pad that’s sustained by a compressed crushed rock bed.
3. Safeguard the generator to the pad with four stainless-steel screws.
4. Have a plumber connect a natural-gas line to the generator.
5. Have an electrical contractor run a line-voltage cable to the generator.
6. The generator examinations itself instantly by turning on every two weeks and also running for concerning 20 minutes.
7. Each time the generator kicks on, an analysis signal is sent through the Internet to the house owner as well as electrician.
8. A transfer button is installed beside the electric meter; it sends power into the house when the power heads out and the generator kicks on.

Follow This Old House and Ask This Old House:.
Facebook:.
Twitter:.

Pinterest:.
G+:.
Instagram:.
Tumblr:.

How to Install an Automatic Standby Generator

Watch the full episode: https://www.youtube.com/watch?v=A8fkVWLZOdc

This Old House host Kevin O'Connor describes how to combat power outages with a standby generator. (See steps below.)

Click here to SUBSCRIBE to the official This Old House YouTube channel: http://www.youtube.com/subscription_center?add_user=thisoldhouse

Steps for How to Install an Automatic Standby Generator
1. Install the generator at least 5 feet from all windows and doors.
2. Set the generator on top of a pre-cast concrete pad that's supported by a compacted gravel bed.
3. Secure the generator to the pad with four stainless-steel bolts.
4. Have a plumber connect a natural-gas line to the generator.
5. Have an electrician run a line-voltage cable to the generator.
6. The generator tests itself automatically by turning on every two weeks and running for about 20 minutes.
7. Each time the generator kicks on, a diagnostic signal is sent via the Internet to the homeowner and electrician.
8. A transfer switch is installed beside the electrical meter; it sends electricity into the house when the power goes out and the generator kicks on.

Follow This Old House and Ask This Old House:
Facebook: https://www.facebook.com/ThisOldHouse
Twitter: https://twitter.com/thisoldhouse
https://twitter.com/asktoh
Pinterest: http://www.pinterest.com/thisoldhouse/
G+: https://plus.google.com/+thisoldhouse/posts
Instagram: http://instagram.com/thisoldhouse
Tumblr: http://thisoldhouse.tumblr.com/

Leave a Reply

Your email address will not be published. Required fields are marked *